Reconstruction typically involves a major change to an existing highway within the same general right-of-way corridor.
Excerpt
Types of Highway Improvement Projects There are four basic types of physical improvement projects, some of which must comply with standards and others that do not have to comply. These types of improvement projects are discussed in the following paragraphs. more...
Route 9 Reconstruction New York, NY
After more than 20 years of planning and design efforts, the reconstruction of what was formerly known as the West Side Highway in Manhattan finally began. A proposal originally conceived in the early 1970s for the construction of a six-to-eight lane interstate freeway facility known as Westway, which would have been partly elevated and partly depressed below grade, was withdrawn in 1985. In 1987, the city of New York and New York State established a joint West Side Task Force in an attempt to reach a consensus on what action should be taken to replace the deficient interim highway, and the alternative ultimately was a basic six-lane urban boulevard with three travel lanes provided on either side of a raised, landscaped median. This project shows how a collaborative, multidisciplinary planning and design process, incorporating a high level of continuous public involvement, can result in the creation of a world-class street design and also how detailed investigations of travel demand and traffic movement patterns can result in a dramatic change in the scale of the proposed improvement.
Case Study
East Main Street Reconstruction Westminster, MD
After more than a year of planning and design, the Maryland State Highway Administration's consultants completed their drawings for Westminster, Maryland's, East Main Street's revitalization. However, the administration and public balked at the plan which called for the removal of 42 100-year-old trees. MD DOT promptly appointed a task force to develop a new plan that would save Main Street's trees, widen sidewalks and improve the efficiency of traffic flow. Through this project, the city and State learned that citizen involvement at the beginning saves time and can result in a project that preserves the heritage of the community and pleases the community members themselves.
Case Study
Carson Street Reconstruction Torrance, CA
Carson Street is a major east-west arterial street running through the middle of the city of Torrance, CA. High levels of traffic congestion on the original four-lane undivided cross sections and the absence of left-turn lanes were responsible for a high rate of accidents on this predominately residential street. After roadway improvements, curb, gutter, and sidewalks were added along both sides of the entire project to provide improved roadway drainage and to accommodate pedestrians and bicyclists. However, it's the improvement to the general aesthetics of the street, including the undergrounding of utilities, that is a major distinguishing feature of the project.
Case Study
Washington SR 99 - International Boulevard Seattle-Tacoma, WA
International Boulevard is a major N/S arterial that serves local and regional traffic within Seattle-Tacoma, Washington. The Incorporated City of SeaTac developed Comprehensive and Transportation Plans that established land-use goals and proposed transportation facility improvements including the expansion of this boulevard and the improvement of its pedestrian access. This project illustrated well that dealing with multiple, conflicting stakeholders within a constrained budget and schedule is possible as long as the key stakeholders understand the problem, have a clear vision of the solution, employ an open and creative process, and commit themselves to compromise.
Case Study
Town Street in Herlev, Denmark Herlev,
"In Herlev a traffic-dominated town street in an area without any special characteristic unity has been converted to a harmonious town space in which the ancient church and the village pond also have been incorporated as significant elements."
Case Study
Third Street Promenade- Santa Monica, California Santa Monica, CA
"In 1965...Santa Monica turned three blocks of its main downtown street into the Third Street Mall, and ultra-spacious auto-free zone. The problem was that this extra-wide space was too big and too daunting for the pedestrian population...and remained that way until the late 1980s, when it underwent a radical face lift, and was transformed into the Third Street Promenade."